1. Open the liquefied gas valve of the joint sealing equipment, and then ignite the liquefied gas furnace (observation hole at the front) provided under the front of the fuselage with an electronic igniter. When it starts to heat, you should adjust the temperature and the pressure reducing valve to make the opening size of the valve matched with the temperature.
2. Add the clean road sealing glue to the melting furnace (about 20Kg at a time, or add the required amount as needed), and cover the lid. The normal use of the crack sealing material should be based on the time. You should keep continuous use of the road crack sealing machine because it can improve the heat utilization rate and greatly improve the melting efficiency.
3. Please do pay attention to the temperature rise of the thermometer in asphalt sealer machine because the temperature cannot exceed the allowable temperature of the crack sealing material. If the temperature exceeds the required, it will cause knot of the crack sealing material.
4. The last step is to start the engine with mixed oil of the asphalt sealer machine, and supply power for the control system and the insulation system according to the operating instructions of the generator.
Recommended news
2022-05-18
2022-05-18
Recommended products
Recommended area

Humanistic Design,Improve the Quality of Work Construction

Stable and reliable, effectively prolong road life

Efficient and Safe,Effective Extensionof Maintenance Cycle

Environmental protection,Avoiding harmful substance discharge
Related case
Submit Demands Online
We will contact you within 24 hours